Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work

Product Details
Customization: Available
After-sales Service: Support
Warranty: One Year
Still deciding? Get samples of US$ 500/Piece
Request Sample
Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Year of Establishment
2013-07-03
Management System Certification
ISO 9001, ISO 9000, ISO 14000, ISO 20000, IATF16949, QC 080000, SA 8000, ANSI/ESD
OEM/ODM Availability
Yes
  • Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
  • Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
  • Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
  • Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
  • Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
  • Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Find Similar Products

Basic Info.

Model NO.
Q195 1.5 Inch 3 Inch
Type
Seamless
Technique
Hot Rolled and Cold Drawn
Material
Carbon Steel or Alloy Steel
Surface Treatment
Galvanized
Usage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape
Round/Square/Rectangular
Model No.
S235jr S355jr Ss400 A36
Product Name
Galvanized Steel Pipe
Standard
BS En10296 BS En10025 BS En10297 BS6323, Bsen10219
Grade
GB/T3091 - 2001 Q195,Q235 , Q345
Surface
Black Bared ,Can Be Galvanized,Oiled,Painted
Secondary or Not
Non-Secondary
Length
1m-12m(Customizable)
Transportation
by Container or Bulk Vessel
Technology
ERW/Efw/Dsaw
Material 2
Q195-235,Q195,Q235,Q345
Packing
in Bundle
Wall Thickness
2.41mm-32.54mm
Od Size
10.3mm-355.6mm
End Protector
Plastic Pipe Caps
Payment Terms
L/C or T/T
Transport Package
Seaworthy Package
Specification
OD: 10.3mm-355.6mm THK: 2.41mm-32.54mm
Trademark
BKS
Origin
Tianjin China
HS Code
7304193000
Production Capacity
2000 Tons/Month

Product Description

Why you choose us?
1. more than 20 years experiences in steel business
2. good quality
3. competitive price
4. meet your needs via reprocessing
5. excellent service
6. short delivery time
7. long mutual beneficial business cooperation

PRODUCT INFORMATION

I.Product Basic Info: 

OD Size

10.3mm-355.6mm

1/8" - 34"

Wall thickness (W.T.)

2.41mm-32.54mm

SCH20, SCH30, SCH40, STD, SCH60, SCH80, SCH100, SCH120, SCH160,XXS

Length

5.8m-12m or as customer's requirements

International Standard

ISO 9001-2008

Standard

BS EN10296,BS EN10025,BS EN10297,BS6323, BSEN10219,

BSEN10217,GB/T13793-1992,GB/T14291-2006 GB/T3091-1993,GB/T3092-1993,GB3640-88

Materials

Q195 → Grade B, SS330,SPHC, S185

Q215 → Grade C,CS Type B,SS330, SPHC

Q235 → Grade D,SS400,S235JR,S235JO,S235J2

Q345 → SS500,ST52

Ends

1.Plain

2.Beveled

3.Thread with Coupling or cap

4.Chamfer

5.Groove

6.Screw

Technique

1.Electronic Resistance Welded (ERW )

2.Electronic Fusion Welded (EFW)

3.Double Submerged Arc Welded (DSAW)

Packing

1.Packed in waterproof plastic bags

2.Big OD:in bulk

3.Small OD:packed by steel strips

4.According to the requirements of customers

Application

1.low pressure liquid, water, gas, oil, line pipe

2.construction

3.fence, door pipe

Main market Middle East,Africa, Asia and some European country and America ,Australia
Country of origin China Tianjin
Productivity 3000 Metric Tons per Month
Surface Treatment 1.Bared

2.Black Painted (varnish coating)

3.Galvanized

4.Oiled

5.PE,3PE, FBE, corrosion resistant coating, Anti corrosion coating.

Inspection With Hydraulic Testing, Eddy Current , Infrared Test
Zinc coating 200g-560g/m2
Payment 1.Payment terms :T/T ,L/C

2.Terms of trade :FOB ,CFR,CIF ,DDP,EXW

3.Minimum order :25 tons


2.Product  Chemical Composition & Mechanical Properties :  
Grade             Chemical Composition   Mechanical Properties
C   Mn    Si        S        P           Yield    Tensile         Elongati
Strength Mpa Strenth Mpa -on %
Q195 0.06-0.12 0.25-0.50 ≤0.30 ≤0.045 ≤0.05 ≥195 315-430 ≥33
Q215 0.09-0.15 0.25-0.55 ≤0.30 ≤0.05 ≤0.045 ≥217 335-450 ≥27
Q235 0.12-0.20 0.30-0.67 ≤0.30 ≤0.045 ≤0.04 ≥235 375-500 ≥26
Q345 ≤0.20 1.00-1.60 ≤0.55 ≤0.04 ≤0.04 ≥345 470-630 ≥22

PRODUCT DISPLAY:
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
 
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction WorkQ195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction WorkQ195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction WorkQ195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
PACKING & SHIPPING

1.Galvaized on the surface

2.Plain,squire cut or bevelled end by caps

3.In hexagon or triangle bundle with steel strips

4. Marking: As per customer's requirment

Shipping details:

Trade Terms:FOB/CIF/CFR

 Payment Terms:L/C,T/T, Western Union.

 Loading Port:XinGang TianJin, China

 Delivery: Within 15-20days after we receive deposit or L/C at sight

Shipping--- by container (Apply to a few or common quantity) or in bulk ( Apply to huge quantity)

Container sizes: 
20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High)
40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High)
40ft HC:12032mm(Lengh)x2352mm(Width)x2698mm(High) 
For 20feet container load 25tons-28tons pipes whose max. length is 5.8m. 
For40feet container load 25tons-26tons pipes whose max. length is 12m.

Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction WorkCOMPANY INFORMATION

Tianjin Boerking Steel Pipe Co.ltd is a  professional  trading company and has been in steel industry for more than 15years, specializing in seamless steel pipe,oil casing/drill pipe, galvanized steel pipe, stainless steel pipe,ERW/SSAW/LSAW/ welded pipe.

      Also we sale hot and cold rolled steel coils,steel plates,galvanized steel coils, all kinds of profiles like H-beam, Angel bar,C profile etc.

      We have established long term cooperations with several famous steel manufactures all over the world, and we can offer you best quality products with competitive price which will give you an edge over your competitors.

      Besides, we offer best service all the time.We will do our best to satisfy you needs for the products. Our products have been sold in many countries and areas of the world including South America, Iran, Kenya, Israel etc, and our export volume reaches 160,000tons per year.
 

      We execute quality gurantee system ISO 9001,2008 strictly and all certicates and the third party inspection like MTC,API,ABS,ISO9001,SGS BV etc. will be provided as client's requirements.

Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction WorkQ195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work


Q195 1.5inch 3inch Scaffolding Tube Pre Galvanized Steel Pipe for Construction Work
 FAQ

Q: What is your MOQ?
A: Generally our MOQ is 2 tons, if small quantity, we can check our stock.

Q: How long is your delivery time?
A: Generally it is 15 days if the goods are in stock. or it is 25~30 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance,balance before shippment.


6. CONTACT US

Contact: Susie Xu
Boer King Steel Group
Tianjin Boer King Steel IMP&EXP Co.,Ltd
Add: No.602,Shuanggang Development Zone,Tianjin,300350 China.
 


Pls. do not hesitate to contact me if you have any questions!

You are warm welcomed to visit our factory!!!


Thank you for visiting our products & Looking forward to hearing from you!








 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier